Ad · 728×90 desktop · 320×50 mobile

Migration Wave Planner

Group applications into phased migration waves.

Inputs

How this tool works

Plans a wave-based migration based on team capacity and app complexity. Rule of thumb: a migration FTE handles 2 apps per month at complexity 3. Wave 1 should always be the easiest apps to let the team build muscle memory.

Ad · 300×250 responsive

Joined by engineers at enterprises running the systems you build. No spam. No tracking in the emails.