Ad · 728×90 desktop · 320×50 mobile

VM rightsizing: the VMware edition

Published 2026-04-24 · Virtualization

On public cloud, a rightsizing mistake costs you money. On post-Broadcom VMware, a rightsizing mistake costs you money AND license capacity. Here's the VMware-specific approach.

Why VMware rightsizing is different

Each vCPU assigned to a VM counts toward Broadcom's core-based licensing. Oversized VMs don't just waste host resources — they waste license purchases. At $135+ per core per year, a cluster with 20% over-allocation is leaking 20% of your licensing budget.

The rightsizing pass

1. Pull 30 days of VM metrics

From vRealize Operations / Aria Operations (or whatever monitoring you have):

  • Peak CPU % over 30 days
  • Peak memory % over 30 days
  • Average CPU Ready %

2. Identify oversized VMs

An oversized VM has:

  • Peak CPU < 30% AND
  • Peak memory < 30% AND
  • CPU Ready < 3%

3. Validate workload type

Before cutting, confirm the VM isn't:

  • Bursty (batch jobs, end-of-quarter reports)
  • Seasonal (retail site pre-Black-Friday)
  • Licensing-locked (some apps require minimum specs)

4. Right-size in staging first

Any VM you touch, change in staging environment first. Soak for 2 weeks. Look for CPU Ready increases, memory ballooning, or unexpected OOMs.

5. Production cuts with rollback plan

One VM at a time. Change tracked in change management. Rollback = revert to prior vMemory/vCPU values in vCenter.

What NOT to do

Don't rightsize during HA stress

If the cluster is at 95% capacity and you cut a VM from 16 to 8 vCPU, you've changed admission control math. Verify HA still passes first.

Don't skip NUMA awareness

VMs that cross NUMA nodes perform worse even with "enough" resources. Prefer vCPU counts that fit within one NUMA node.

Don't rightsize DB VMs without the DBA

DB tuning requires DBA buy-in. Always.

Tools

Ad · 300×250 responsive

Joined by engineers at enterprises running the systems you build. No spam. No tracking in the emails.